CLIENT |
PROJECTS |
CONTRACT NO |
LOCATION |
YEAR |
STATUS |
---|---|---|---|---|---|
SHELL |
Soku Lp Nag Rerouting AG2/AG3 Compressor Project |
- |
SOKU |
2023 |
ONGOING |
SHELL |
Installation of Coriolis Meter @Kolo creek Manifold |
- |
KOLO CREEK |
2023 |
Completed |
SHELL |
Full Replacement of Otumara well 8S/Flowline @ |
- |
OTUMARA |
2023 |
Completed |
SHELL |
Sectional Replacement on 36”TNP @ |
- |
IBA |
2023 |
Completed |
SHELL |
Leak Repair by clamping on 18” Assa to Rumuekpe TL@ |
- |
EGBEDA |
2023 |
Completed |
SHELL |
IC Repair by split-tee on 36” Rumuekpe –Nkpoku@ |
- |
NDELE |
2023 |
Completed |
SHELL |
IC Repair by Slit Tee in-service welding on 24” TNP@Baralue |
- |
BARALUE |
2023 |
Completed |
SHELL |
Soku Alternate Condensate Evacuation |
- |
SOKU |
2022 |
Completed |
SHELL |
Soku Alternate Condensate Evacuation |
- |
SOKU |
2022 |
Completed |
SHELL |
Soku ACE Addittional works |
- |
SOKU |
2022 |
Completed |
SHELL |
Soku ACE Punchlist Works |
- |
SOKU |
2022 |
Completed |
SHELL |
1.7km W10L Flowline Replacement |
- |
BENESEDE |
2022 |
Completed |
SHELL |
Installation of Coriolis Metre/Upgrade on new &old Kolocreek/Rumuekpe Line@Kolo creek manifold |
- |
KOLO CREEK MANIFOLD |
2021 |
Completed |
SHELL |
12”x6KM Pipeline construction works @Akenfa/Gbaran |
- |
AKENFA/GBARAN |
2021 |
Completed |
SHELL |
Replacement Of Diebu Creek Well 9t Flowline |
- |
DIEBU |
2021 |
Completed |
SHELL |
Sectional Replacement Of Otumara Well 42L/S,16T 4L,And Fabrication Of Well 4L Hook-up Arm |
- |
OTUMARA |
2021 |
Completed |
CLIENT
|
PROJECT
|
CONTRACT NO
|
LOCATION
|
YEAR
|
STATUS
|
---|---|---|---|---|---|
SHELL
|
Gbaran phase 3@Enwhe pipeline package 2
|
-
|
AKENFA
|
2021
|
Ongoing
|
SHELL
|
Replacement Of Diebu Creek Well 9t Flowline
|
-
|
DIEBU
|
2021
|
Ongoing
|
SHELL
|
Sectional Replacement Of Otumara Well 42l/S,16t,4l And Fabrication Of Well 4l Hook-up Arm
|
-
|
OTUMARA
|
2021
|
Ongoing
|
SHELL
|
Sectional Replacement Otumara well 8 & 12 Flowlines
|
-
|
OTUMARA
|
2020
|
Completed
|
SHELL
|
Soku Well 7 Sectional Replacement(3.8km)
|
-
|
SOKU
|
2019
|
Completed
|
SHELL
|
Soku Well 7 Sectional Replacement
|
-
|
SOKU
|
2019
|
Completed
|
SHELL
|
Soku Well Platform Installation Works
|
-
|
SOKU
|
2019
|
Completed
|
SHELL
|
Leak Repair on 18” Assa-Rumuekpe T/L
|
.
|
EGBEDA
|
2019
|
COMPLETED
|
SHELL
|
Valve change out on 14” Okordia Rumuekpe T/L
|
.
|
OKORDIA MANIFOLD
|
2019
|
COMPLETED
|
SHELL
|
Hook up arm Modificaton/hydro-test at Soku well 31
|
.
|
SOKU
|
2019
|
COMPLETED
|
SHELL
|
Platform Removal/Installation of scaffold at soku well 48
|
.
|
SOKU
|
2019
|
COMPLETED
|
SHELL
|
Full Replacement of Soku well 22L
|
.
|
SOKU
|
2019
|
COMPLETED
|
SHELL
|
Integrity check on well 2
|
.
|
BENESEDE
|
2019
|
COMPLETED
|
SHELL
|
Barrel door change out @ Kolo creek
|
.
|
KOLO CREEK
|
2019
|
COMPLETED
|
SHELL
|
Barrel door change out Okordia M/F (2 DOORS)
|
.
|
OKORDIA MANIFOLD
|
2019
|
COMPLETED
|
SHELL
|
4” Flowline replacement @ Diebu creek
|
.
|
DIEBU CREEK
|
2019
|
COMPLETED
|
SHELL
|
Leak repair by clamping on the 16” Egbema-Assa T/L
|
.
|
ASSA
|
2018
|
COMPLETED
|
SHELL
|
Leak Repair by clamping on the 10”Diebu creek to Nun River D/L
|
.
|
OPOROMA
|
2018
|
COMPLETED
|
SHELL
|
Leak repair by clamping on the 10”Diebu D/L
|
.
|
NANGIAMA
|
2018
|
COMPLETED
|
SHELL
|
Leak Repair by sectional Replacement on 10” Diebu creek to Nun River D/L
|
.
|
OPOROMA
|
2018
|
COMPLETED
|
SHELL
|
Gbaran 9T and 4T Celluar Pit Cover/Handrails
|
.
|
GBARAN
|
2018
|
COMPLETED
|
SHELL
|
IP Defect Identification/Verification on 16” Nun River to Kolo creek T/L
|
.
|
OPOROMA/ ANGIAMAGBENE
|
2018
|
COMPLETED
|
SHELL
|
IP Defect in service welding repair bu split sleeces on the 16” Nun River T/L
|
.
|
ANGIAMAGBENE
|
2018
|
COMPLETED
|
SHELL
|
Faculty barrel door change out on 16” Egbema-Assa T/L @ Assa Manifold
|
.
|
ASSA
|
2018
|
COMPLETED
|
SHELL
|
Leak Repair by clamping on the 16”
|
.
|
EGBEMA/ASSA
|
2018
|
COMPLETED
|
FACULTY
|
|||||
SHELL
|
Replacement of Soku well IT Flowline
|
.
|
SOKU
|
2017
|
COMPLETED
|
SHELL
|
Post IP Defect repair by sectional replacement on 8”
|
.
|
ETELEBOU
|
2017
|
COMPLETED
|
SHELL
|
Post IP defect repairs by sectional replacement on 24”
|
.
|
NONWA/KEBARA
|
2017
|
COMPLETED
|
SHELL
|
Post IP Repairs By Clamping On 12” Oguta-Egbema D/L
|
.
|
OGUTA-EGBEMA
|
2017
|
COMPLETED
|
SHELL
|
Post IP Crude Defect Point Repair by Sectional Replacement on 36” TNP
|
.
|
RUPOKWU
|
2017
|
COMPLETED
|
SHELL
|
Leak Reapir By Clamping on 12” D/L
|
NGO1002626
|
OGALE
|
.
|
COMPLETED
|
SHELL
|
Construction of Cofferdam, Draining/Depressurization and Repair of Crude Theft Point by clamping on the 28” TNP
|
NGO1013102
|
OWOKIRI
|
2016
|
COMPLETED
|
SHELL
|
Well head cellar upgrade work
|
NGO2030741
|
.
|
2016
|
COMPLETED
|
SHELL
|
Repair by clamping on 16’’ Nun River T/L –Kolo creek T/L using bundwall
|
NG1013102
|
AGUOBIRI
|
2015
|
COMPLETED
|
SHELL
|
Leak Repair by Clamping on 10’’Diebu D/L using Bu bundwall
|
NG1013102
|
OPOROMA
|
2015
|
COMPLETED
|
SHELL
|
10’’ Diebu Creek D/L Dent Removal by Sectional Replacement &Valves change out
|
NG1013102
|
PEREMABIRI
|
2015
|
COMPLETED
|
SHELL
|
Post IP Defect repair on 12`` trunk line
|
NG1013102
|
ELEME MANIFOLD
|
2014
|
COMPLETED
|
SHELL
|
Sectional replacement on 24`` D/Line
|
NG1013102
|
BELEMA
|
2014
|
COMPLETED
|
SHELL
|
Wellhead Cellular Upgrade
|
NGO1017705
|
LAND 1
|
2014
|
COMPLETED
|
FRONTIER
|
Supp[y of FUN commissioning and Operation Tools
|
039/EKT/2014
|
EKET
|
2014
|
COMPLETED
|
SHELL
|
10``, 8``,12`` Valve change out
|
NG01013102
|
NEW ELEME
|
2014
|
COMPLETED
|
FRONTIER
|
Supply of O and M Critical Tools
|
013/EKT/2014
|
EKET
|
2014
|
COMPLETED
|
EXXONMOBIL
|
Provision Of Water Treatment Services
|
4500993093
|
BONNY
|
2013-2014
|
COMPLETED
|
EXXONMOBIL
|
Procurement and Installation of Valves and Reflex Gauges from Penberthy, U.S.A.
|
4500976929
|
EKET
|
2013
|
COMPLETED
|
SHELL
|
Construction of coffer dam for repair by clamping on 8” trunk line.
|
-
|
RUKPOKWU ROW
|
2012
|
COMPLETED
|
SHELL
|
Mechanical modification
|
NG01011803
|
Nun river flow station
|
2012
|
COMPLETED
|
SHELL
|
Mechanical Modification
|
NG01011803
|
Ubie Flow station
|
2012
|
Completed
|
EXXONMOBIL
|
Supply of Basler Electrical Products
|
4500673927
|
France to Q.I.T.
|
2012
|
COMPLETED
|
SHELL
|
Replacement of collapsed flarestack,walkway and and pilot line with RIS
|
NG01011803
|
Agbada 2 flow station
|
2012
|
COMPLETED
|
SHELL
|
Mechanical Modification
|
NGO1011803
|
Diebu creek
|
2012
|
COMPLETED
|
SHELL
|
Thermocouple armored cable supply
|
-
|
Port Harcourt I.A
|
2011
|
COMPLETED
|
SHELL
|
Ekulama 2 W 38L/S flowline construction
|
E-14688
|
Ekulama 11
|
2010
|
COMPLETED
|
SHELL
|
Clean-up/remediation
|
-
|
Adibawa flow station Saver pit overflow
|
2010
|
COMPLETED
|